Installation of Mining offices at Deflector
MINING PROJECTS
Installation of Mining offices at Deflector
Installation and modification of Mining Offices at Matilda
Refurbishment of Village and Mining Administration at Matilda (Blackham)
Core Farm Facility Defelector
Supply and Install Deflector 136 man camp and Mining Infrastructure Turnkey package
Administration and Infrastructure – Vivian Mine
Relocation and office Complex Tallering Peak to Hinge
Roebourne Quarry Works, Minesite Infrastructure, Turn Key Solution, Electrical, Plumbing, Septics, Concrete, Roofing for Offices, CRIB Rooms etc
80 man camp (Mt Gibson Road), Turnkey Solution, Works included Building Placement, Electrical, Plumbing, Air Conditioning, Concrete Veranda’s, Waste Water Treatment, Portable Water Treatment
Demobilization – Sino Steel Mid-West Morawa Camp 2013
80 man camp (Onslow), Turn Key Solution, Works included Building Placement, Electrical, Plumbing, Air Conditioning, Concrete Veranda’s, Waste Water Treatment, Portable Water Treatment
Blue Hills Karara Mine Site Infrastructure, Turn Key Package for Offices, Workshops, Weighbridge, Electrical, Plumbing, Concrete Works including Septic Systems etc
Area C sustaining capital office and heritage building electrical, plumbing and communications including fibre optic
150 rooms stage 1 (stage 2, 400 rooms) electrical, air conditioning
Workshop electrical and plumbing Morawa
201 man smart camp electrical, plumbing, communications including fibre optic and TV, HV ring main extension, RMU and kiosk. Water tanks, biomax and 3 km run to evap pond
Mining facilities, offices and workshop
4MW power station including HV substation and power line modifications
200 room stage 2 works, electrical, plumbing and buildings
80 room camp electrical, plumbing, communications and TV
Stage 1, 60 room camp plumbing, electrical, air conditioning, communications and TV
300 room camp plumbing, electrical, air conditioning, communications and TV
33kV power line, mine dewatering/ borefields, pumping stations, central facilities infrastructure plumbing, electrical, air conditioning
Pannawonica mess upgrade, 10 transit houses plumbing, electrical, air conditioning, communications and TV
48 room camp plumbing, electrical, air conditioning, communications and TV
Leinster dry mess upgrade and refurb including site setup of temporary kitchen 12 floors including all site services complexing and concrete.
200 room camp plumbing, electrical, air conditioning, communications and TV
144 room camp plumbing, electrical, air conditioning, communications and TV
108 room camp plumbing, electrical, air conditioning, communications and TV
Pit dewatering, pump stations, MCC installations, electrical works
Dewatering, pump stations, bore pump control, MCC installations, electrical works
3 extra bays, plumbing, electrical, air conditioning steel piping (welded flanged)